Power Generation
Up to 17,500 W continuous, 26,500 W surge, plus 8 kW three-phase.
Power • Weld • Air • Anywhere
Cheetah is a rugged, multi-function mobile productivity platform that puts a generator, a welder and an air compressor into one 580 lb machine. It is built for the contractors, utilities, farms, mines and governments that build Africa and the world.
Up to 17,500 W continuous, 26,500 W surge, plus 8 kW three-phase.
Up to 350 A multi-process welding: Stick, TIG, MIG and Arc.
About 40–80 CFM @ 150 PSI from an IR CE55 rotary screw.
A planned add-on that makes Cheetah a 4-in-1 machine for remote communities.
The Cheetah advantage
Worksites usually move a separate generator, welder and compressor, and each one needs its own fuel, transport, maintenance and operator. Cheetah puts all three on one trailer-mountable platform. That means fewer machines to mobilize, lower total cost and more work done per day.
Machine comparison
Cheetah against the Lincoln SAE-400 WELD'N and the Big Blue Air Pak CC/CV. Figures are taken from the Cheetah comparison sheet.
Powering Africa naturally
At 580 lbs, Cheetah weighs a fraction of the competition, which makes it light enough to reach villages, schools and clinics far from the grid. The Cheetah Power Initiative brings that power to the communities that need it most.
Together, let's pull Africa forward.
Cheetah is about 76% lighter than the Lincoln SAE-400.
Cheetah delivers more output for less fuel than the Lincoln.
The most compact package in the class, and the only one with a remote shut-off.
| Machine comparison | Cheetah | Lincoln SAE-400 WELD'N | Big Blue Air Pak CC/CV |
|---|---|---|---|
| Weld process | Stick, TIG, MIG, Arc | DC Stick & TIG | DC Stick, TIG and MIG |
| Rated weld output | 500 A @ 40 V = 20 kW 100% 600 A @ 44 V = 26.4 kW 40% | 400 A @ 36 V = 14.4 kW 60% | 500 A @ 40 V = 20 kW 100% 600 A @ 44 V = 26.4 kW 40% |
| Weld output (current) | 225 A presently | 80–575 A | 20–750 A |
| Weld output (voltage) | 14–40 V | — | 14–40 V |
| Arc control | Arc Drive | Not available | Arc Drive |
| AC while welding (peak) | 5.5 kW peak | 3 kW Type 1 | 5.5 kW |
| AC while welding (continuous) | 4 kW | Not available | 4 kW |
| 120 V receptacles | (1) 20 A GFCI duplex | (1) 15 A duplex, fused | (1) 20 A GFCI duplex |
| Over-voltage protection | Circuit breaker protected | Not available | Circuit breaker protected |
| 240 V receptacles | (1) 30 A Twistlock, L6-30 | (1) 15 A duplex, fused | (1) 30 A Twistlock, L6-30 |
| 3-phase AC power (not welding) | 70 A @ 120 V; 35 A @ 240 V, 8 kW continuous | Not available | Available on Deluxe model |
| Air compressor | IR CE55 rotary screw | Reciprocating | IR CE55 rotary screw |
| Air output | 40 CFM @ 90 PSI 100% | 35 CFM @ 95 PSI 60% | 60 CFM @ 100 PSI 100% |
| Engine | Deutz BF4M2011 oil cooled, turbo 4-cyl | Perkins 1004.42 liquid cooled, 4-cyl | Deutz BF4M2011 oil cooled, turbo 4-cyl |
| Engine RPM | 64 hp @ 1,800 RPM | 71 hp @ 1,725 RPM | 64 hp @ 1,800 RPM |
| Automatic idle | Standard | Standard | Standard |
| Sound @ 23 ft (idle / full) | 70 dB / 78 dB | Not available | 70 dB / 78 dB |
| Auto engine shutdown | Oil temp, oil pressure | Coolant temp, oil pressure | Oil temp, oil pressure |
| Engine instrumentation | Fuel gauge, hour meter, oil temp, oil pressure, air pressure, battery voltage | Battery, hour meter, water temp, oil pressure, air pressure, comp oil pressure | Fuel gauge, hour meter, oil temp, oil pressure, air pressure, battery voltage |
| Engine service side | Right side, removable | Left side | Right side, removable |
| Fuel consumption | 1.6 gal/hr @ 20 kW 100% | 2.2 gal/hr @ 14.4 kW 60% | 1.6 gal/hr @ 20 kW 100% |
| Fuel tank | 25 gal (95 L) top fill | 22.5 gal (85.1 L) top fill | 25 gal (95 L) top fill |
| Dimensions H×W×D | 32 × 18 × 68 in | 50 × 28 × 83 in (1270 × 711 × 2109 mm) | 43 × 28.5 × 67.5 in (1092 × 724 × 1715 mm) |
| Weight | 580 lbs | 2,428 lbs (1,101 kg) | 1,931 lbs (875 kg) |
| Third-party certification | Built to ISO 9000 specifications | None | CSA, MSHA |
| Operational temperature | −40°F to +140°F | — | — |
| Intake manifold heater 12 V | Factory standard | Optional ether | Field 043959 |
| 120 V oil pan heater | Factory standard | None | Field 195086 |
| Welding meters | Field 195131 | None | Field 195131 |
| Battery lockout/tagout disconnect | Field 195120 | None | Field 195120 |
| Vandalism lockout | Field 195118 | None | Field 195118 |
| AC/DC/battery charge 12/24 | Field 195148 | None | Field 195148 |
| Generator | 70 A @ 120 V; 35 A @ 240 V, 8 kW continuous | None | N/A |
| Muffler | None | None | Factory standard |
| Additional features | No belts • No pulleys • No chains • No adjustments • Cold start • Remote shut-off (50 ft) • Trailer mountable • Dual lifting eyes | None | None |
| Future models | Diesel • Propane • PTO • Agricultural • Hydraulic | None | None |
Power the tools, weld the steel and run the air tools from one machine while the structure goes up.
Learn more
On-site repair and shutdown maintenance without hauling three separate machines to the plant floor.
Learn more
A compact, 580 lb platform for line crews and field technicians working far from the grid.
Learn more
Rapid-deploy power, cutting, welding and air for disaster recovery and public-safety teams.
Learn more
Repair equipment in the field, run irrigation pumps and, with the planned purifier, provide clean water.
Learn moreContractors, farms, rural owners and small businesses
Municipalities, utilities, military and emergency response
Construction, energy, mining, manufacturing and telecommunications
The opportunity
Cheetah sells into the generator, air-compressor and welding markets at once. Together they form a global opportunity of more than $87 billion.
Africa mobile air-compressor market in 2024, growing at a 3.9% CAGR to 2030
African air-compressor market, 2023 to a projected 2030
Africans who still lack electricity access, according to the IEA
Infrastructure investment Africa needs each year through 2040
Annual growth of Africa's construction-equipment market, 2025–2031
Share of private capital deployed in Africa since 2023 that went to infrastructure
Sources cited in the Cheetah investor material: Africa Mobile Air Compressor Market Size Report 2030; Africa Air Compressor Market estimate; International Energy Agency; African Union, Africa's Development Dynamics 2025; Global Private Capital Association; 2026 Africa construction-equipment industry analysis; World Bank Open Data; Tracking SDG7: The Energy Progress Report 2025. Market figures cover adjacent sectors and are not Cheetah's directly addressable market.
Cheetah Africa
Cheetah starts in West Africa. Ghana is the proposed demonstration market, with Nigeria as the regional manufacturing and distribution hub. The plan is to prove the commercial model there, build a West African corridor, and then move into East and Southern Africa.
Ghana had Africa's largest announced greenfield project in 2025, an estimated $5B chemicals investment (UNCTAD, via Business Insider Africa). The first customers would be:
Once the model is proven in Ghana, Cheetah evaluates neighbouring markets one at a time: Nigeria, Côte d'Ivoire, Togo, Senegal and others. It does not try to cover the whole continent at once. The Nigeria hub, near the Lekki Deep Sea Port, handles port intake, regional distribution and local delivery.
East Africa has the continent's largest infrastructure investment need relative to GDP, at 9%, followed by Central Africa at 8% (African Union). Target markets include Kenya, Tanzania, Rwanda, Ethiopia, South Africa, Zambia and Mozambique.
Generator + welder + air compressor, with water purification planned next.
Dealers, parts, technicians and training across the corridor.
Local assembly, government partnerships, contractor programmes and infrastructure projects.
“Cheetah is synonymous with Africa. When I was on the ground in the 2000s, Africa embraced me, and the construction concept I was delivering to government, with tremendous respect. Awareness today is far greater than it was then. This machine, patented and developed by a Black man, will be embraced by all of Africa. Let's go make a difference.”
Global supply chain network
Two hubs: Denton, Texas for U.S. manufacturing, R&D and global distribution, and Nigeria for regional manufacturing, distribution and growth across the continent. From there, Cheetah expands into Asia and Latin America.
Electricity-access rates alone don't measure Cheetah demand. India and Indonesia both report 99.9% access (World Bank, 2024), yet remote construction and industrial sites still need mobile equipment.
Ghana → West Africa → East & Southern Africa
India → Indonesia → Philippines
Mexico → Brazil → Peru → Colombia
North America, Europe, Middle East, Central Asia, Australia & Pacific
Investor overview
An illustrative 5-year global growth model. It assumes an average selling price of $15,000 per machine and a 48% gross margin. These are planning assumptions, not forecasts.
| Units | Revenue* | Gross profit* | |
|---|---|---|---|
| Year 1 | 1,100 | $16.5M | $7.9M |
| Year 2 | 2,500 | $37.5M | $18.0M |
| Year 3 | 5,000 | $75.0M | $36.0M |
| Year 4 | 7,500 | $112.5M | $54.0M |
| Year 5 | 10,000 | $150.0M | $72.0M |
Five-year cumulative illustrative volume: 26,100 machines.
Move the sliders to explore illustrative annual scenarios.
These are illustrative enterprise-value scenarios, not a current or projected market capitalisation. Real valuation depends on EBITDA, expenses, debt, cash, capital structure, IP, comparable-company multiples and market conditions.
Investment vision
The long-term plan is an international platform covering manufacturing and assembly, distribution, dealer networks, training, parts and service, and strategic partnerships.
Manufacturing facility & equipment plan

10 workstations, tools, lighting, compressed air, rolling carts, bar-code tracking, safety and E-stop systems.

Gardner Denver rotary screw (125 PSI @ 75 CFM, 3-phase), air receiver, dryers, filters, Legris Transair piping.

Miller 300 DX (MIG/TIG/Stick), Miller Spectrum 625 plasma cutter, oxy-acetylene, ventilation and filtration.

Shear, brake, roll and notcher, hydraulic press, band saw, drill press, grinders and material racks.

12' × 12' × 10' powder-coat booth, sprayers, HazMat storage, breathing apparatus and fire suppression.

Exhaust venting, 12 V jump starter, fuel tanks (gas, LP, diesel), electronic test equipment and test benches.
A modern facility built for a brighter, more productive future.
Office & administration
A glassed-off, soundproof front office and a two-story administration level that overlooks the manufacturing floor. It is wired with high-speed networking for engineering, logistics, sales and investor operations.
Africa jobs impact
Local jobs, local skills, real opportunity. Every Cheetah facility invests in people and builds stronger communities.
Eezinet • FCC-licensed spectrum
Eezinet is one of the companies acquired to add broadband to Cheetah's technology and to the African market. Its FCC spectrum licence supports a full range of connected services.
Pop. 2,292 (2000). 1,731 sq mi total area, of which 1,704 sq mi is land and 27 sq mi (1.54%) is water.
Pop. 747 (2000). 783 sq mi total area, of which 776 sq mi is land and 7 sq mi (0.89%) is water.
Pop. 6,198 (2000). 2,470 sq mi total area, of which 2,441 sq mi is land and 29 sq mi (1.17%) is water.
Valuation prepared by Bernard Gaiter. County data: U.S. Census Bureau via Wikipedia.
See it in action
Watch: Cheetah Machines
Read the publication
Flip through the Cheetah Vision publication below, or open it full screen in a new tab.
Our African entity
Greatland Africa Development Company Limited is the incorporated Nigerian company that carries the Cheetah mission on the continent. It anchors local manufacturing, government partnerships, dealer and service networks, and the Nigeria hub on the Lagos/Ogun corridor.
Investor infographics
Tap any infographic to view it full size.
Get in touch
Investors, distributors, governments and contractors are welcome. Tell us how you would like to work with Cheetah Machines.